2 Mar at 11:02 am
Electricity pylon and overhead lines, illustrating the Ofgem connections end-to-end review and reforms to speed up UK grid connections.

Connections reform must deliver transparency and real competition

September 2, 2025
ooftops of a residential area during sunset, with solar panels visible on some of the houses, contrasting with a chimney emitting smoke in the background, symbolizing a mix of renewable energy adoption and traditional energy use.

Unlocking Infrastructure to Deliver Growth: Why Land Rights Reform Matters

September 16, 2024
A photograph of the UK Treasury building in London. The historic, classical-style architecture features ornate stone detailing and prominent towers. A black taxi cab is driving along the street in front of the building, and bare trees line the pavement. The sky is overcast, giving the scene a muted, grey tone.

Accelerating Growth and Decarbonisation: the INA’s Recommendations for the October Budget

February 20, 2024
Alt text: "A close-up view of an electricity pylon against a clear blue sky. The steel lattice structure is prominently displayed, with several sets of insulators hanging from the cross arms, connecting to overhead power lines.

Tackling the Connection Queue Crisis: A Call to Action

February 1, 2024

Empowering the Future: Revolutionising Electricity Networks for Electric Vehicle Charging Infrastructure